I've PC'ed 5 or 6 sets of VC's for local guys. No issues. Runs about $275 and turn around time is a week on average. Make sure the people know beforehand that these are magnesium so they don't get the furnace too hot for too long. Nobody needs that fire.
Solvent dip them after bead or shell blasting them to get the oils out, acid etch lightly and powder away. You'll be happy.
__________________
'03 4.6is (the wife' s ride)
|