My new M50d was delivered to the US shipping dock on the 26th Jan 2015 bound for Australia, it has sat there for 46 days before being loaded onto a ship on the 14th March 2015.
Have informed BMW that I will not accept the vehicle that has been sitting exposed to the elements for 46 days, and a further 30 days on a freighter? delivery is now to be to be end of April now? instead of mid March 2015
A boat leaves every 10 days so I have asked for an explanation? It does not matter how much of a protective coating is on the vehicle, that industrial fallout damages paint, pits glass and not to mention the flat stops on the 20" tyres.
__________________
X5 M50d White | 20" Rims | Adaptive Drive, Self-Lvl Susp | Act/Steer | HUD | Xenon, Adapt Lights | H-Beam Ast | Rear/Side Camera | Panorama S/roof | Auto Tailgate | Comfort, Active, Ventilated, Heating, Lumbar, Navada Perforated Leather Seats | Comfort Access | M-Steer Wheel w Pdle Shift |Sports 8-Speed | Active Crus Stop/Go | Proff Nav + TV, DAB | 16 Spk Ind Audio | USB |Internet-eMail-SMS-Apps | 4 Zone Air | Speed D/play | Towbar | 20% Tint | 5mm Castor Bushes | Yellow Calipers, Ceramic Pads |
Last edited by watrob; 03-30-2015 at 05:57 AM.
|