Xoutpost.com

Xoutpost.com (https://xoutpost.com/forums.php)
-   X5 (E53) Forum (https://xoutpost.com/bmw-sav-forums/x5-e53-forum/)
-   -   Quick question about Running Boards (https://xoutpost.com/bmw-sav-forums/x5-e53-forum/63206-quick-question-about-running-boards.html)

Philly X5 06-26-2009 11:45 PM

Quick question about Running Boards
 
Hey,
I just received OEM running boards for my 03.4.4i:thumbup:
Anyone can tell me how much time it takes to install them if I have all needed tools....aprox. :dunno:

mrbmwx5 06-27-2009 01:40 AM

If i'm doing it.... it will take me about 45min...
normal time is 1h 30min- 2hours.

JohnD 06-27-2009 08:50 AM

Took me about 2 hours - but I was also swapping the wheel at the same time

chile1 06-27-2009 10:11 AM

Quote:

Originally Posted by mrbmwx5 (Post 635085)
If i'm doing it.... it will take me about 45min...
normal time is 1h 30min- 2hours.

Took me about 45min as well...........

ESP 06-27-2009 08:29 PM

agreed, it really only takes about 45 minutes, but no sense in trying for a speed record. I would budget 2 hours total for everything, including cleanup.

m5james 06-27-2009 11:38 PM

How much did you get them for, and which style did you get?


All times are GMT -4. The time now is 08:19 AM.

vBulletin, Copyright 2026, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.6.0
© 2017 Xoutpost.com. All rights reserved.