|
||||||||
| Xoutpost server transfer and maintenance is occurring.... |
| Xoutpost is currently undergoing a planned server migration.... stay tuned for new developments.... sincerely, the management |
![]() |
|
|
LinkBack | Thread Tools | Display Modes |
|
|
|
#1
|
|||
|
|||
|
DPF/SCR Delete diy?
I've had my 2012 X5 for a few months now, and I'm finally getting around to look into delete options. My main question is, for those that have DIY'ed, how long did it take you without access to a lift? For those that paid to have the labor done, how much is a reasonable cost/hours? I'm debating whether to tackle it myself without a lift or pay someone. I've seen reports that it takes 4 hours for an experienced shop to do it, and about 12 hours to DIY?
Thanks ! |
|
#2
|
|||
|
|||
|
I paid $850 labor for an EGR, cat, and DPF delete.
Gesendet von iPhone mit Tapatalk |
|
#3
|
||||
|
||||
|
^That sounds about right - considering the component removal, I believe the subframe needs to be dropped about 6 inches to get the DPF out - Plus the block offs on the EGR, or deleting with a race pipe, etc - Its a full days work and if you want it done right I'd pay someone -
My local shop also will install the swirl flap deletes at the same time and check for any carbon buildup, which is not prevalent on the X5's as much as the sedan because of our low pressure EGR - the tech at my shop said most of the X5's can just be wiped out, however they don't know for sure unless its open - Also a good time for them to replace the Thermostat, do a coolant drain and fill, and check for any frayed vaccuum lines -
__________________
2018 Ram 2500 6.7L Cummins 68RFE 19k miles -Bright White/Black - Big Horn Sport - Crew Cab Short Bed 2013 X5 35D (CEO's) - Born on 5/17/2013 - 82k miles - Alpine White/Cinnamon Brown/Premium Pkg, Sport Activity/Premium Pkg and Sound/20" Style 214/Running Boards |
|
#4
|
|||
|
|||
|
I did it in my back yard. I put the X5 up on ramps in the back and stands in the front. Started disassembly one weekend, sent the DDE out the following week, and had it all together and running by the end of the second weekend.
I was working alone and had not done it before. I'd say it was about 12-16hrs of actually working on things. I also soaked the intake in purple power that week to remove some of the oil sludge.
__________________
![]() 2009 xDrive35D Comfort seats, Tech, Premium, Cold Weather, Sport w/ Adaptive Drive, Extended Nappa Leather Deleted & Stg 2+ Tune for over 115k miles 227k on the clock Being replaced by a 2016 X5d |
![]() |
| Bookmarks |
|
|
|
|