Home Forums Articles How To's FAQ Register
Go Back   Xoutpost.com > BMW SAV Forums > X5 (E70) Forum
Fluid Motor Union
User Name
Password
Member List Premier Membership Today's Posts New Posts

Xoutpost server transfer and maintenance is occurring....
Xoutpost is currently undergoing a planned server migration.... stay tuned for new developments.... sincerely, the management


Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 01-01-2010, 07:04 PM
Member
 
Join Date: Oct 2009
Location: UK
Posts: 48
gen2c4s is on a distinguished road
Visit to dealer

Car went in for the following:
1) Leak in washer system
2) Door sill trim riding up not able to keep it down.
3) PDC inactive warning came on and system not working
4) Auto lights stay on in sunlight and turn off in fog!!
Any I was told to pick up at midday after taking it in at 9am which I did and this is the result:
1) New pipe needed in headlamp wash part of system. Item not in stock on order but they have disconnected fuse to headlamp washer.
2) Needs new trim, not in stock.
3) Need new sensor for rear...guess what....not in stock.
4) No fault found.
So basically naff all got done and to make matters worse there is a 5 week lead time on the PDC sensor as it needs painting.
The car was brand new in November so ownership is just brilliant. To add insult to injury during a washing session yesterday I noticed a small 4 mill scratch has appeared on the door protector strip. I know it wasnt there when it went in.
Not having a pleasurable ownership yet! lets hope 2010 gets better.
Reply With Quote

Sponsored Links

  #2  
Old 01-01-2010, 10:09 PM
ard ard is offline
Member
 
Join Date: Mar 2006
Location: Sierra Foothills, California
Posts: 6,765
ard is on a distinguished road
Look at the bright side: they could have kept it for 2 days before getting it back to you!

If there is any way to document the incorrect operation of the autolamps (via cell camera) you should try that.

It is interesting that your PDC is 'inactive' and the fault is a paintable sensor... ALL your sensors bad? How? Perhaps this system will turn the entire thing off if one is bad....

GL

A
Reply With Quote
  #3  
Old 01-02-2010, 02:45 AM
rh71's Avatar
Member
 
Join Date: May 2007
Location: LI | NY
Posts: 3,924
rh71 is on a distinguished road
inspect your vehicle on the premises thoroughly everytime you get it back... last time they dinged my rim... it always seems to come back with something. Take it in as few times as possible.
__________________
'08 X5 3.0si - Alpine White / Saddle Brown interior
Specs: Sport Pkg, Premium Pkg, Tech Pkg, Comfort Access, Aero Kit, Style 433 staggered 20s on Conti DWS
Mods: Carbon 35 tint, LED angel eyes, GP Thunder 7500k fogs, H&R 20mm/25mm spacers, clear reflectors, gunsmoke-tinted taillights
Coded: Digital speedo, windows/sunroof/tailgate close via keyfob

X5 pics at Flickr

Last edited by rh71; 01-02-2010 at 11:16 AM.
Reply With Quote
  #4  
Old 01-02-2010, 03:39 AM
ard ard is offline
Member
 
Join Date: Mar 2006
Location: Sierra Foothills, California
Posts: 6,765
ard is on a distinguished road
Quote:
Originally Posted by rh71 View Post
Take it in as few times as possible.

Sad but true...
Reply With Quote
  #5  
Old 01-02-2010, 05:20 PM
Member
 
Join Date: Oct 2009
Location: UK
Posts: 48
gen2c4s is on a distinguished road
Quote:
Originally Posted by ard View Post
Look at the bright side: they could have kept it for 2 days before getting it back to you!

If there is any way to document the incorrect operation of the autolamps (via cell camera) you should try that.

It is interesting that your PDC is 'inactive' and the fault is a paintable sensor... ALL your sensors bad? How? Perhaps this system will turn the entire thing off if one is bad....

GL

A
Its apparently a rear sensor but it keeps comming up with "inactive, contact dealer". Because my car is an m sport the rear bumper is colour coded so apparently this means it needs painting.
Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On





All times are GMT -4. The time now is 11:55 PM.
vBulletin, Copyright 2026, Jelsoft Enterprises Ltd. SEO by vBSEO 3.6.0
© 2017 Xoutpost.com. All rights reserved. Xoutpost.com is a private enthusiast site not associated with BMW AG.
The BMW name, marks, M stripe logo, and Roundel logo as well as X3, X5 and X6 designations used in the pages of this Web Site are the property of BMW AG.
This web site is not sponsored or affiliated in any way with BMW AG or any of its subsidiaries.