Home Forums Articles How To's FAQ Register
Go Back   Xoutpost.com > BMW SAV Forums > X5 (E70) Forum
Arnott
User Name
Password
Member List Premier Membership Today's Posts New Posts

Xoutpost server transfer and maintenance is occurring....
Xoutpost is currently undergoing a planned server migration.... stay tuned for new developments.... sincerely, the management


Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 01-01-2010, 09:26 PM
Member
 
Join Date: Dec 2009
Location: Texas
Posts: 6
Prof is on a distinguished road
Need advice, may change order

My wife has a X5 35d on order. Her options include the following:

Heated front seats
iPod and USB adapter
Premium Package
Technology Package
Trailer hitch

She now is considering adding the comfort seats and rear climate package and wanted some feedback on the options. We live near Dallas Texas. She hauls two dogs in the back seat. She was concerned that the standard windows had no tinting and if she had the windows tinted that it would not hold up with the dogs saliva. So she will probably add the rear climate package but was wondering if the window shades rattle. The rear climate package would also help to keep the grocery's cool if she puts them on the floor.

She was also wondering if the extra $1300 for the comfort seats are worth it.

Thanks for the feedback
Reply With Quote
  #2  
Old 01-01-2010, 09:34 PM
Member
 
Join Date: Oct 2007
Location: Canada
Posts: 527
nynd is on a distinguished road
I opted for them when I had the vehicle and would say yes, go for it. The slight window tint in a nice feature and becuase its in between the glass layers, more durable than aftermarket. As well, shades do not rattle (if you open the window you need to put them down).

Comfort seats - yes!
__________________
SOLD - 08 X5 (Titanium Silver w/Black Nevada with all options).
Reply With Quote
  #3  
Old 01-01-2010, 09:52 PM
ard ard is offline
Member
 
Join Date: Mar 2006
Location: Sierra Foothills, California
Posts: 6,765
ard is on a distinguished road
Comfort seats? YES.

The rear climate is nice..the shades don't rattle, and the occupants like the control. I suppose it depends on how smart her dogs are.....



Do your homework on the hitch... if the dealer is screwing you on the price, you can always do it later. After all, the dealer will do it after the car arrives as an 'aftermarket, dealer installed option'...
Reply With Quote
  #4  
Old 01-01-2010, 10:05 PM
Member
 
Join Date: Sep 2009
Location: Portland, OR
Posts: 50
NotEntirelyJack is on a distinguished road
Comfort Seats are awesome!!! Get them! I added them on after I ordered mine and they are the best option that I added. I actually added the active ventilated seats since my wife liked the massage thing that the seats do but the comfort seats by themselves are the best!

I also have the rear climate package but have only had the car for a few weeks so I cant comment on the durability or the dog saliva issues that you are asking about.
Reply With Quote
  #5  
Old 01-01-2010, 10:37 PM
Member
 
Join Date: May 2009
Location: USA
Posts: 822
FunfDreisig is on a distinguished road
IMHO BOTH options are must haves

The 'comfort' seats are not as good as they were on the E53 models. But they are much better than the standard seats. For us, the ability to adjust the shape of the seat back is worth the price of admission.

The rear climate package is a little pricey but worth it here in Texas for the factory tint and rear window shades, which are much better than the ones on the E53. The separate rear controls are very handy for groceries, pets and maybe even human guests

Funf Dreisig
Reply With Quote
  #6  
Old 01-01-2010, 11:29 PM
JCL's Avatar
JCL JCL is offline
Premier Member
 
Join Date: Mar 2005
Location: Vancouver, Canada
Posts: 11,851
JCL will become famous soon enoughJCL will become famous soon enough
As you will have determined from the above posts, there are two groups of BMW owners. Those who have comfort seats, and will never go back, and those who haven't tried them yet. Add another vote for comfort seats here.

No opinion on the rear climate, but if you have most of the other options, why not?
__________________
2007 X3 3.0si, 6 MT, Premium, White

Retired:
2008 535i, 6 MT, M Sport, Premium, Space Grey
2003 X5 3.0 Steptronic, Premium, Titanium Silver

2002 325xi 5 MT, Steel Grey
2004 Z4 3.0 Premium, Sport, SMG, Maldives Blue
Reply With Quote
  #7  
Old 01-02-2010, 08:54 AM
cmyX6go's Avatar
Hell on wheels....
 
Join Date: Jun 2005
Location: in a black dress
Posts: 12,736
cmyX6go will become famous soon enough
Quote:
Originally Posted by JCL View Post
As you will have determined from the above posts, there are two groups of BMW owners. Those who have comfort seats, and will never go back, and those who haven't tried them yet. Add another vote for comfort seats here.
They are sooooo comfortable. I love them. You should go for the Nappa leather while you're at it. It's so soft, great combo with the comfort seats.
__________________


Current:
2016 X6 ///M Black Sapphire Metallic

Last edited by cmyX6go; 01-02-2010 at 09:05 AM.
Reply With Quote
  #8  
Old 01-02-2010, 11:15 AM
Craig's Avatar
Member
 
Join Date: Jul 2007
Location: MO
Posts: 849
Craig is on a distinguished road
Quote:
Originally Posted by cmyX6go View Post
They are sooooo comfortable. I love them. You should go for the Nappa leather while you're at it. It's so soft, great combo with the comfort seats.
+1
I have both comfort seats and nappa leather...

Craig
Reply With Quote
  #9  
Old 01-01-2010, 10:27 PM
Craig's Avatar
Member
 
Join Date: Jul 2007
Location: MO
Posts: 849
Craig is on a distinguished road
Comfort seats for sure. I would also add comfort access. I have the rear climate as well. Heated seats are a must for resale in a cold climate...

Craig
Reply With Quote
  #10  
Old 01-01-2010, 11:50 PM
Member
 
Join Date: Aug 2006
Location: DC
Posts: 524
Price is on a distinguished road
I'd say rear climate package isn't worth it if no humans are expected to ride in the back. Mostly because the factory tint is very light, you almost think they forgot to put it when you first see it.
Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On





All times are GMT -4. The time now is 06:46 PM.
vBulletin, Copyright 2026, Jelsoft Enterprises Ltd. SEO by vBSEO 3.6.0
© 2017 Xoutpost.com. All rights reserved. Xoutpost.com is a private enthusiast site not associated with BMW AG.
The BMW name, marks, M stripe logo, and Roundel logo as well as X3, X5 and X6 designations used in the pages of this Web Site are the property of BMW AG.
This web site is not sponsored or affiliated in any way with BMW AG or any of its subsidiaries.